February 2010
Mosquito Update February 2010

- Engine mount installed on the aircraft

- Plumbing installed under the cockpit floor

- Running the plumbing in the bomb bay. This is only step one. The hoses will all need to be removed to be painted, then re-installed.

- Old plumbing in the bomb bay

- New plumbing installed

- Bomb bay with new plumbing

- Pneumatic hydraulic panel with new plumbing

- Control cables running back towards the tail

- Tail wheel retract cylinder, new plumbing and control cables

- Outboard fuel tank vent.

