January 2011

mossiejan2011-001

Cowlings in place.

Engine oil tank installation in gear well.

Engine oil tank installation in gear well.

Upper rear gear well.

Upper rear gear well.

Wing gear well nacell.

Wing gear well nacell.

Fuel drop tank attach point.

Fuel drop tank attach point.

Engine primer pump.

Engine primer pump.

Rear bombay.

Rear bomb bay.

Bomb bay fuel tank.

Bomb bay fuel tank.

Fuel line fairing, bottom of L/H wing.

Fuel line fairing, bottom of L/H wing.

L/H undercarriage doors.

L/H undercarriage doors.

Pilot instrument panel

Pilot instrument panel

R/H instrument panel.

R/H instrument panel.

Pilots oxygen regulator.

Pilots oxygen regulator.

R/H cockpit electrical panel.

R/H cockpit electrical panel.

R/H leading edge of wing where engine radiators are housed.

R/H leading edge of wing where engine radiators are housed.

Rear fuselage wiring.

Rear fuselage wiring.

Emergency hand pump installation.

Emergency hand pump installation.

Rear of instrument panel.

Rear of instrument panel.

Rear fuselage.

Rear fuselage.

Rear fuselage showing hydraulic tank & wiring.

Rear fuselage showing hydraulic tank & wiring.

Victoria Air Maintenance
9650 Hurricane Road
North Saanich, BC
Canada V8L 5V5
Phone: (250) 656-7600