January 2012

Update on CF-HML - deHavilland Mosquito

Work has been progressing on the restoration of CF-HML.  The Canopy glass is installed and complete.  Wheels and tires are installed, the gear doors are installed and rigged and the gear swing is complete.  The pneumatic system has been checked.  Wiring is complete in the cockpit.  Window piping is completed and the air drier installed.  The engines have been overhauled by Vintage V12s and are back and ready to install.

Canopy and glass complete

Canopy and glass complete

Wheels and tires installed.  Gear doors installed and rigged.  Gear swing complete.

Wheels and tires installed. Gear doors installed and rigged. Gear swing complete.

Wiring completed in cockpit.

Wiring completed in cockpit.

Intercooler complete

Intercooler complete

Flight controls rigged.

Flight controls rigged.

mosquito-115

mosquito-128

mosquito-124

mosquito-126

Engines being unloaded

Engines being unloaded

mosquito-021-2

mosquito-027-2

mosquito-028-2

mosquito-024-2